On August 23, 2025, in a special edition of the Federal Official Gazette, the Ministry of Mines and Energy (MME) launched Public Consultations (PCs) No. 194/2025 and No. 195/2025 to gather contributions on draft ordinances establishing the guidelines for the 2026 Power Reserve Auction (the LRCAP 2026), designed to contract the availability of fully flexible power plants.
Two auctions are scheduled:

Contributions to both consultations may be submitted until September 12, 2025.
This auction replaces the previous LRCAP 2025, which was scheduled for June this year but was subsequently canceled. Since then, market participants had been anticipating the announcement of the next auction, particularly in light of projected power requirements for October 2026, as indicated by the National Electric System Operator (ONS). The timeline below presents this background and the milestones for LRCAP 2026.

LRCAP 2025 vs. LRCAP 2026:
- Established a total of eleven product types, compared to seven in the canceled auction;
- Explicitly excluded the participation of new and existing biofuel thermal plants, new diesel- or fuel oil thermal plants, and new coal thermal plants;
- Introduced separate products for natural gas thermal plants connected to the transportation system (“A” products) and those not connected (“B” products);
- Established that new and existing thermal plants to be contracted from 2028 onwards will compete under the same product;
- For products covering the 2028–2030 period, defined an “existing plant” as one holding a concession and having been authorized for commercial operation by the date of the auction notice, even if such operation is currently suspended — a provision not included in the LRCAP 2025 ordinance;
- Required proof of fuel availability for continuous operation in the case of oil thermal plants.
Products offered and their comparison with the previous draft:

As in the LRCAP 2025 guidelines, thermal plants may qualify if they have a non-zero Variable Unit Cost (CVU) and zero inflexibility. In addition, thermal plants that meet the following operational flexibility parameters will be eligible:

Fuel availability: Proof is required for an initial minimum period of 7 years, plus an additional period of 5 years or the equivalent of the remaining duration of the CRCAP, whichever is longer.
Remuneration: Annual Fixed Revenue (RF) corresponding to the availability of the contracted capacity, paid in 12 monthly installments and adjusted based on operational performance in preceding months.
The RF must cover: (i) IRR; (ii) connection costs; (iii) transmission/distribution system usage costs; (iv) O&M; (v) insurance and guarantee costs and the seller’s financial commitments; (vi) taxes and direct and indirect charges; (vii) costs arising from the obligation of permanent availability for dispatch at the ONS’s discretion, including fuel storage and logistics (if applicable); and (viii) costs arising from the obligation to maintain the availability of the contracted power throughout the contract, including any investments.
Penalties in CRCAPs 2026:
- Unavailability exceeding the reference indices reported at registration;
- Failure to meet the commitments to deliver contracted power availability;
- Failure to comply with centralized dispatch, as commanded by the ONS, considering:
- For thermal plants: failure to deliver the power requested by the ONS during a generation dispatch for power supply will result in a 1% reduction of the monthly RF installment for each hour of non-compliance, applied proportionally to the amount of undelivered power, up to a maximum of 30% of the corresponding monthly installment;
- For hydro plants: unavailability of the generating unit at the time of dispatch for power supply will result in a 1% reduction of the fixed revenue for each hour of unavailability, also limited to 30% per month.
Access the PC content and its documents here.
Our team is available to assist you on this topic and related matters. If you have any questions or need clarification, please do not hesitate to contact us.