On August 2, 2024, the National Mining Agency (“ANM“) issued Resolution No. 175/2024, which amends provisions of Resolution No. 95, dated February 7, 2022, which consolidates regulations on mining dam safety. The Agency’s aim is to streamline administrative proceedings and provide more detailed regulations for clarity and effectiveness.
CHANGES:
One of the main changes made by the resolution relates to the drained stacks not susceptible to liquefaction. The new wording establishes that such stacks must be reassessed according to the designer and/or technical manager’s determination, replacing the previous requirement of reassessment at intervals not exceeding one year. In other words, the technical manager may now set reassessment intervals shorter or longer than one year for these structures.
Another significant change addresses the Periodic Dam Safety Review (RPSB), of which maximum frequency is defined based on the structure’s Potential Associated Damage (DPA). If there is a change in the potential damage classification, a new review may be required within six months. To this end, Resolution No. 175/2024 clarified the DPA reclassifications that entail the need for a new review, namely:
(i) when the classification of tailings or sediments changes from inert to non-inert or hazardous; or
(ii) when the classification changes from non-inert to hazardous.
The Agency also modified provisions regarding the prior execution of the RPSB. As of the effective date of the new resolution, in cases of tailings reuse or sediment removal, prior execution of the RPSB will no longer be necessary. Only in cases of dewatered tailings stacks must those responsible conduct the previous review, under penalty of embargo or suspension of activity.
Regarding the RPSB, an important provision was added concerning the team responsible for the review. According to the new resolution, the team must be multidisciplinary and external, composed of professionals with no link with the team which prepared the last Regular Safety Inspection Report (RISR) or the entity to which that team was subordinated. No technical, commercial, economic, financial, corporate, or employment link is allowed.
Similarly, the technical manager responsible for issuing the Declaration of Conformity and Operability (DCO) must be distinct from the technical managers responsible for preparing the Emergency Action Plan for Mining Dams (PAEBM) and the hypothetical dam break study and must not have any link with the entity responsible for preparing these documents.
The Assessment of Conformity and Operability (ACO) of the PAEBM is now mandatory only for dams with medium DPA, when the “downstream communities” item scores 10 points, or for dams with high DPA. It is no longer required for all mining dams listed under the National Dam Safety Policy (PNSB). Dams with low or medium DPA which do not score 10 points in the “downstream communities” item no longer need to conduct the ACO, not even in a simplified form.
NEW INCLUSIONS:
Regarding the PAEBM, while the requirement for all mining dams to have a plan already existed, the new resolution explicitly states that failure to meet the deadlines for preparing the PAEBM may result in the immediate embargo or suspension of the mining dam’s activities.
Minor adjustments were also made regarding the definition of dam raising construction methods. For exceptional cases where the construction or raising method is not covered by the Resolution, a provision was added allowing the ANM to decide which method the dam falls under through technical analysis.
Another notable introduction is a new Alert Situation event. This occurs when the overflow system is not adequately sized according to the specified return period, unless it is in the process of being adjusted. As a result of this classification, dams with inadequately sized overflow systems will no longer be automatically considered high-risk.
The new resolution will come into effect on September 2nd, 2024, the first business day of the month following its publication.
Our team shall continue to follow up on these developments and remain at disposal for any additional queries on the matter.