ANEEL complies with TCU ruling and regulates the granting of tariff discounts on grid usage under Law No 9.427/1996

Authorization requests filed on or after November 22, 2023, may be affected by the new resolution, and measures for compliance may be required even if the authorizing act has already been issued.

On october 10, 2025, the Brazilian Power Regulatory Agency (ANEEL) issued Normative Resolution (REN) No. 1,134/2025, following Public Consultation No. 13/2024 and in compliance with rulings of the Federal Court of Accounts (TCU).

The new regulatory guidelines stem from findings by the TCU’s Specialized Electric Power Audit (AudElétrica) of potential improper segmentation of renewable generation projects with installed capacity below 300 MW, intended to qualify for the 50% discount on transmission and distribution use-of-system charges (TUST/TUSD) provided in Article 26, paragraph 1-A, of Law No. 9,427/1996.

The rules introduced by REN No. 1,134/2025 do not apply to facilities authorized before November 22, 2023, and apply primarily to generating plants covered by Order No. 1,518/2024, which are subject to a Term of Declaration to Proceed with Authorization (TDPA) and a Term of Declaration to Suspend Authorization (TDSA)).

Key points include:

  • Classification as a Generation Complex requires meeting all the following criteria cumulatively:
    • sharing the same grid connection point;
    • use of the same generation technology, except for Hybrid Generating Plants (UGH);
    • belonging to the same economic group, under direct or indirect common corporate control, or being affiliates or deemed affiliates.

Sharing the same metering system is not required.

Eligibility for the use-of-system tariff discount is conditioned on the aggregate  injected capacity of the generating facilities comprising the Generation Complex not exceeding 300 MW. CCEE shall verify compliance and submit the applicable discount factors to ONS for calculation of the Transmission System Use Charge (EUST).

REN No. 1,134/2025 also introduces the following new corporate concepts:

    • Affiliate (sociedade coligada): Company with an equity interest of at least 20% in another company, without exercising control; and
    • Deemed affiliate (sociedade coligada equiparada): Company with an indirect interest of at least 20% of the voting capital of another company, without exercising control.

All other definitions (corporate control; direct and indirect control; and economic group) shall follow the concepts set forth in Annex III to REN No. 948/2021.

Who is subject to classification as a Generation Complex?

  • Authorization requests or requests to amend technical characteristics that are subject to TDPA or TDSA, pursuant to Order No. 1,581/2024.
  • Authorization requests (i) filed on or after November 22, 2023; and (ii) sharing the same grid connection point as generating plants with TDPA or TDSA.
  • The regulatory authorizing act shall indicate the Generation Complex to which the generating plant belongs.

Assessment of Generation-Complex status

  • The status will be subject to (i) ex-ante; and (ii) ex-post assessments.
  • The ex-ante assessment shall occur before decisions on:
    • authorizations that are the subject of a TDSA;
    • authorizations (i) filed on or after November 22, 2023, and (ii) sharing the same grid connection point as plants with TDPA/TDSA;
    • granting discounts for authorizations that are the subject of a TDPA;
    • amendments to technical characteristics that entail a change in the grid connection point of plants subject to Generation Complex classification;
    • authorization of dedicated (interest-restricted) transmission lines linked to authorizations (i) subject to TDSA or TDPA; or (ii) filed on or after November 22, 2023, and sharing the same grid connection point as plants with TDPA/TDSA.
  • To obtain the tariff discount by generating plants with authorizations subject to TDPA or TDSA must be requested from ANEEL. For TDSA cases, the request must be filed within 30 days of the resolution’s publication (by November 9, 2025), failing which it will be denied.
  • A post-transaction review will apply whenever a change in ownership or control alters the Complex’s classification under the resolution, including any resulting additions, removals, or changes to generating units.
  • The transaction must be notified to ANEEL so that the authorizations can be updated, under penalty of refunding any discounts unduly received. A refund may also be required in the event of inaccuracies in the information provided.
  • ONS and CCEE shall submit proposals to enhance the Grid Procedures and the Trading Rules and Procedures within 90 days from the resolution’s publication (by January 8, 2026).
  • REN No. 1,134/2025 will be subject to a Regulatory Result Assessment (ARR) after 6 years of effectiveness.

The Energy & Infrastructure team of Veirano Advogados stands ready to assess the resolution’s impact on your project and to advise on strategic decisions in light of ANEEL’s new regulatory framework. We welcome challenges and prioritize agility, efficiency, and results.